Image 5

Integration & Testing

Whether a machine has minimal control components or is a large integrated complex machine, the safety aspects, functionality and recovery aspects all have to be thoroughly tested against safety, specifications and failure effect documents. Sub systems can be tested in isolation, but also need to be tested as an integral part of the machine. GB Innomech can produce the required documentation for system tests, safety tests and functional tests and test the machine ensuring that the machine attains the required specifications and standards.

Validation